PROJECT SCOPE
 STORMWATER, NDD, ASBESTOS

The Project: A full stormwater upgrade at the school, designed by the project engineer — complicated by asbestos in the ground. We worked to the engineer’s design, non-destructively digging every trench after hours to manage the contaminated ground safely. Installed new drainage and pits.

The outcome: Delivered to the engineer’s design and handed over to the client.